C&D Waste EPR
for Contractor / Authorised Agency
Who qualifies as a Contractor / Authorised Agency, what you must do under the Environment (Construction & Demolition) Waste Management Rules, 2025 (superseding the C&D Waste Management Rules, 2016), and how Social Lab runs the entire obligation for you.
- ✓ 550+ companies advised
- ✓ CPCB-registered partner
- ✓ Expert-reviewed filings
You’re a Contractor / Authorised Agency under C&D Waste EPR if…
Assists the generator in channelising waste and meeting EPR and utilisation obligations, coordinating with the local authority, recyclers and storage facilities.
A Contractor or Authorised Agency assists the waste generator in channelising waste and meeting EPR and utilisation obligations. The obligation itself remains with the generator registered on the CPCB portal.
Not sure this is you? Run the free applicability checker →
C&D waste, from site to reused material
The scope you register and report against as a Contractor / Authorised Agency.
Where a Contractor / Authorised Agency sits in the C&D Waste chain
Material moves through the chain below. Your step is highlighted — each other step links to what that role has to do.
- 01 Waste generator
The construction or demolition project producing the waste.
- 02 Contractor / Agency You are here
Channelises the waste and helps meet utilisation obligations.
- 03 Local authority / ULB
Coordinates collection and city-level infrastructure.
- 04 Recycler
Processes debris into recycled aggregate and products.
Not sure which role you actually hold? Many businesses hold more than one — and the obligation follows the role, not the job title.
Compliance you can forget about
We take the whole C&D Waste EPR obligation off your plate and stand behind every filing — backed by EPR specialists and a track record across India.
Talk to our EPR team →From registration to target fulfilment to audit — managed on your behalf, not just explained.
Every filing is reviewed by an EPR subject-matter expert before it goes out.
On-ground in Maharashtra, serving companies across the country.
550+ companies advised across every notified EPR stream.
Other roles under C&D Waste EPR
Many businesses register in more than one role. Here’s the rest of the C&D Waste EPR map.
A waste generator registered on the CPCB portal for a project with 20,000 sq m+ built-up area; bears the EPR obligation, follows SOPs and IS 4130 demolition safety, prepares an integrated waste-management plan, and meets recycling targets.
See the Producer obligation → Waste GeneratorThe occupier in control of the construction/demolition activity; must segregate waste by stream (concrete, soil, bricks, steel, wood, plastics), store and channelise it, and transport 100% to collection/storage facilities or an authorised agency.
See the Waste Generator obligation → RecyclerRegistered on the portal; recovers reusable material from C&D waste via on-site or off-site processing.
See the Recycler obligation → Local Authority / ULBActs as implementing agency for waste utilisation and (with CPCB/SPCB) approves management and utilisation plans.
See the Local Authority / ULB obligation →EPR compliance delivered for leading companies





Contractor / Authorised Agency FAQs: C&D Waste EPR
Who is a Contractor / Authorised Agency under C&D Waste EPR?
Assists the generator in channelising waste and meeting EPR and utilisation obligations, coordinating with the local authority, recyclers and storage facilities.
Does a Contractor / Authorised Agency have to register for C&D Waste EPR?
A Contractor or Authorised Agency assists the waste generator in channelising waste and meeting EPR and utilisation obligations. The obligation itself remains with the generator registered on the CPCB portal.
What are the C&D Waste EPR targets?
The 2025 rules set EPR recycling targets (Schedule I) and minimum waste-utilisation targets for building (Schedule II) and road (Schedule III) construction, phasing up to 2030-31. Producers must deposit 100% of their C&D waste to a processing facility. Exact year-by-year recycling percentages should be confirmed against the final notified gazette.
What happens if a Contractor / Authorised Agency doesn’t comply?
Environmental Compensation is levied on entities violating the rules — including unregistered producers/recyclers and those missing EPR or waste-utilisation targets. Payment does not cancel the obligation, with graded refunds (up to 85% if cured early, down to 30%, nil after three years). Collected funds sit in an escrow account for managing legacy/orphan waste.
C&D Waste EPR, off your plate.
Get a free contractor / authorised agency applicability assessment, or talk to our EPR team today.
Or call +91 80101 21726 · [email protected]